Find the constraint in context

A slow cycle can reflect material starvation, a machine issue or downstream congestion. Compare timestamps and adjacent process steps before identifying a single machine as the bottleneck.

Separate symptoms from causes

Review output, stops, rejection records and operator observations together. Check whether event reasons are entered consistently and whether clocks are aligned. A chart is a starting point for investigation, not proof of a cause.

Validate the change

Agree on the intervention and observation period. Compare similar products, shifts and conditions, then document what changed. Avoid attributing every improvement to software when staffing, material or scheduling changed at the same time.

Put this into practice

  • Compare the same product and shift conditions.
  • Check upstream starvation and downstream blocking.
  • Verify stop reasons with the operators before choosing an intervention.

Explore the related solution

V-MES (Industry 5.0 MES) connects this topic to a practical business or operational workflow. Talk to VEERA to define the requirements for your organization.

Related reading

← Back to all insights